Hear how combinatorial optimization algorithms can be incorporated into practical business applications and made available to extend the capabilities of scheduling personnel.
Hear how combinatorial optimization algorithms can be incorporated into practical business applications and made available to extend the capabilities of scheduling personnel.
In this webinar we discuss why a mindset shift to value chain optimization is needed and the approach needed to digitally transform value chain optimization activities.
Learn how a digital energy management solution can help to identify and sustain performance improvements.
Find out how a NOC in Asia utilized data analytics and KPI trees to systematically align performance objectives and KPIs in its gas processing division to achieve profit driven operations.
Braskem showcase how its people and processes made energy real-time optimization a success.
This webinar will showcase the huge potential for AI and ML algorithms to be utilized and scaled more widely when coupled/trained by first principles simulation, with major benefits in how simulation is used.
This webinar will showcase the huge potential for AI and ML algorithms to be utilized and scaled more widely when coupled/trained by first principles simulation, with major benefits in how simulation is used.
This webinar showcases how Chevron drives transformational value through multi-site optimization.
Repsol's Optimization & Simulation Advisor talks about how a refinery digital twin leads the digitalization program at Repsol and allows the business to maximize production while optimizing energy consumption.
Understand the fundamentals of FCCU in this demo of KBC's FCC-SIM Kinetic model. Our expert will configure the model to represent the Fluid Catalytic Cracking Unit to evaluate feed and operating changes.
Understand the fundamentals of FCCU in this demo of KBC's FCC-SIM Kinetic model. Our expert will configure the model to represent the Fluid Catalytic Cracking Unit to evaluate feed and operating changes.
Join us for a fireside chat where we'll dissect some Digital Transformation projects and see if there are commonalities across different industries, and what characterizes a good vs Digital Transformation.